2020-07-28[FIX] purchase_mrp: receive kits with multiple UOMNicolas Martinelli
- Create 3 products A, B & C A is in Units B is in kg C is in m - Create a BOM kit for A using 1 kg of B and 1 m of C - Create a PO for A, validate - Receive the picking An error is raised: "Conversion from Product UoM ... to Default UoM ... is not possible as they both belong to different Category!." It happens because `_compute_qty_received` incorrectly converts quantities. The computation of the quantity received for kits is done in 2 steps: first we compute the quantity the same way we do it for a regular product, then we overwrite the quantity with the value computed for kits. We can compute the quantity correctly at once by calling `super` only on lines which are not kits. opw-2302807 closes odoo/odoo#55047 X-original-commit: b82f71dac9452de9c1e16cde552fe260fec3c262 Signed-off-by: Nicolas Martinelli (nim) <nim@odoo.com>
2020-06-30[FIX] *: correct all or improve code translation lookupMartin Trigaux
This commit fixes all issues detected by the new pylint gettext-variable test. It converts some calls to the new syntax _("Foo %s", bar) to progressively migrate the code to the new syntax. A few calls were not technically incorrect but still detected by the linter. _("Foo" + "Bar") has been converted to _("Foo" "Bar") as it has the same effect and make sure the argument is of type asteroid.Const instead of BinOp). closes odoo/odoo#53683 Related: odoo/enterprise#11467 Signed-off-by: Raphael Collet (rco) <rco@openerp.com>
2020-06-15[FIX] purchase_mrp: fix count MO in case of MTORémy Voet (ryv)
task-2241471
2020-06-15[REF] mrp: backorder mechanismRémy Voet (ryv)
Allow to "backorder" a production, meaning create another manufacturing order with the quantity remaining to produce. We also use the reservation of the first order on the next ones by using `post_inventory` on the first one and moving the newly created stock moves to the backorder. We introduce a wizard similar to the one in stock. Backorders have a sub-sequence. Backorders are linked together through the procurement group. We allow creating a backorder even if workorders are running by closing them, the backorder will call `button_plan` and create its own. task-2241471
2020-01-28[REF] purchase_stock: push the extra quantitySimon Lejeune
With a product configured as buy on order and a warehouse configured as receipt in two steps, if the user increases the quantity on a po line generated by a sale order before confirming it, the system will send all the quantity to input but only the ordered quantity to customer. The issue is that the "extra quantity" will stay in input. We fix this issue by creating a new move with the extra quantity to the input location so that push rules will send the extra quantity to stock while the ordered quantity will be sent to the customer. There was also an issue when incrementing the quantity on the po line after confirmation if the po line was the result of a reordering rule: only a move from supplier to the location of the reordering rule was created. This commit also introduces a change of semantic: `created_purchase_line_id` is cleared after confirming the RFQ. This allows to merge more in `_merge_moves`. task-1981355 closes odoo/odoo#43545 Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2020-01-24[IMP] purchase_mrp: link MO<->MO<->PO in case of MTORémy Voet (ryv)
In case of MTO (+buy) on products used in a MO, add the link between the MO source and the PO generated. Also add links between MO's when MTO+manufacturing. task-1913392 closes odoo/odoo#43366 Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2020-01-15[FIX] purchase_mrp: return string instead or recordsetWilliam Henrotin
Commit e923058 aims to ensure the key 'created_purchase_line_id is returned only if the move as this field filled. The issue is due to the way python compare falsy object. a = b and c will return b (not False) if b is falsy will return c if neither b nor c are falsy. If move_raw_id passed in the method doesn't have created_purchase_line_id iterate_key = purchase.line.id() or 'created_purchase_line_id' = purchase.line.id() which is not correct as the method should return a string or False. closes odoo/odoo#43320 Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2020-01-09[FIX] purchase_mrp: ensure that a purchase order is linkedArnold Moyaux
closes odoo/odoo#41115 Related: odoo/enterprise#7177 Signed-off-by: Simon Lejeune (sle) <sle@openerp.com>
2019-07-17[REM] *: calls to @api.multiAdrian Torres
Multi is the default api for methods, it is not necessary to explicitly decorate methods with it, adds clutter and most people use it because they see that the rest of the code uses it. Done with `find . -type f -name '*.py' | xargs sed -i '/@api.multi/d'`
2019-01-25[IMP] mrp, purchase_mrp: Quantity received for kits in a POArnaud Baes
This commit generalize the method made for computing the quantity delivered in a sale order in order to be used for the quantity received for a kit in a purchase order. TaskID: 1929518
2018-12-19[REF] mrp, purchase_mrp: find bom depending on its typeArnaud Baes
This commit refactors the method '_bom_find' in order to search bom based on their type. This allows to handle the cases where a Kit has the route 'Manufacture' set. TaskID: 1863856
2018-12-04[IMP] mrp: quantity_done on kits in immediate transfersarbaes
With this commit, when a kit is processed trough an immediate transfer, the quantity done set on the kit is now propagated to its components. TaskID: 1896772 closes odoo/odoo#28998
2018-10-30[REF] purchase_*: change received qty apijem-odoo
The received quantity on Purchase Order line can be compared to the delivered qty on Sales Order line. It is now time for both to share the same mecanism (introduced in 3bf8a62e0dd99f7dad42718f895abf4fd53f996f). This commit sets `qty_received` as a computed field, depending of a method (`qty_received_method` field) to compute it. The value can be computed based on - manual value; for services (all the time), and consummable products (when stock is not installed). - stock moves; for stockable and consummable products (when stock is installed) This is now easier to extend the way the received quantity need to be computed (like in sale). Task #1850689 closes odoo/odoo#27663
2018-10-22[MERGE] forward port branch saas-11.4 up to 3c108977c1eChristophe Simonis
2018-10-11[MERGE] forward port branch 11.0 up to 717f4583949Christophe Simonis
2018-10-10[FIX] purchase_mrp: Received Quantity in Purchase Order remains '0'Goffin Simon
Steps to reproduce the bug: - Create Product P: with BOM type - Kit and BOM components > Set - Invoicing: on delivered quantity - Create PO with P and confirm - shipment 1 will be generated - Cancel the PO - shipment 1 - will also get canceled - Reset the canceled PO to quotation and confirm it - new shipment 2 will be generated - Validate the shipment and receive product KIT Bug: Check PO - 'Received Qty' was not updated Inspired from: https://github.com/odoo/odoo/commit/c2dfdc3081764a492a94024f1fb57e15636b04c9 opw:1889303 closes odoo/odoo#27622
2018-08-13[IMP] mrp: log activityArnold Moyaux
Pickings/MO/SO/PO can be linked. Only the increased quantity is propagated between documents. However their ordered quantities can also be decrease or they can be cancel. In this case an activity is created on impacted documents in order to describe the situation and inform the user that a manual action is probably require. Also in order to propagate the increased quantity from a MO, we have to do important modification in MRP and we want to avoid doing it before a major release. That's why increased quantity on a MO also work with activity at the moment.
2018-07-19[FIX] purchase: Error when updating dropship orderGoffin Simon
Steps to reproduce the issue: - change the demo user settings -> use Sales: User: All Documents only - create a stockable product with dropship feature on and a supplier - connect as the demo user - create a sales order with this product - confirm the order - as the admin user, confirm the purchase order generated through dropship - connect as the demo user - open the confirmed SO - add a line with this product - save the SO Bug: An access rights error was raised. opw:1866015
2017-11-16[MERGE] forward port branch 11.0 up to d279a3e6d57Christophe Simonis
2017-11-14[FIX] mrp, purchase_mrp: purchase_line_id also with kitsSimon Lejeune
When confirming a move for a kit, it is basically unlinked and replaced by moves for its component. The link to the purchase line was kept in v10, but since rev[1] it is not anymore. Make an helper to get the values and override it in purchase_mrp to add the purchase line link. [1] https://github.com/odoo/odoo/commit/8248f0e153ae5fcc1449d0d05149b61df615ad4f opw 779497
2017-11-08[IMP] purchase: edit received quantity on purchase_line when type servicePierre Masereel
When we purchase products of type services,the received quantity is always set to the ordered quantity. We want to be able to manually enter a received quantity on service products to have a better trace of what have been received or not. We show the picking stat button olnly if there are picking We show the columns qty_received, qty_invoiced and invoice_status depending on the parent state, and not depending on the context passed in the menu item.
2017-04-28[FIX] Various P3-related import changesxmo-odoo
* LDAP import: python-ldap is not python3-compatible, pyldap is Warning: only supported from debian Stretch (current testing)? https://packages.debian.org/search?searchon=names&keywords=pyldap * implicitly relative imports * imports of moved or removed stdlib modules issue #8530
2017-02-02[FIX] sale_mrp, purchase_mrp: delivered quantityNicolas Martinelli
- Create a manufactured Product A (sold as kit), invoicing based on delivered quantity. - Create the associated BOM, e.g. contains 2 Products B. - Create a SO with Product A, validate - Change the BOM so it contains 2 Products C - Validate the picking linked to the SO The delivered quantity is not updated since the delivered products (B) are not the same than the products of the BOM. This should not be the case. Changing a BOM should not affect the invoicing. To solve this, we simplify the check and only verifies that all moves are done. The same change is applied for PO.
2016-09-28[MERGE] forward port branch saas-12 up to 7134affChristophe Simonis
2016-09-28[FIX] mrp: correct interpretation of explode's quantity parameterJosse Colpaert
In previous versions, the quantity passed to the bom_explode was the number of times you needed to count the BoM. If the BoM was for 2 dozens and you pass 48 units, 2 was passed to the bom_explode method. We are now doing the same for the explode method and we check it is called this way everywhere.
2016-08-01[REF] product_uom, *: clean quantity computation methodsThibault Delavallée
product_uom._compute_quantity is an ensure one multi method taking a browse record as second paramter. It replaces _compute_qty and _compute_qty_obj to have a single and standard computation method.
2016-07-04[REF][NEWPIE] mrp: new MRPJosse Colpaert
This commit contains the core of the new MRP. It contains a whole refactoring of the MRP application, with improved and new features, written in new API. Among other here are the main manufacturing workflow improvements : - Picking type not only for pickings but also for manufacturing orders - Properties replaced by picking type - BoM can only be produced with its routing (no other) - Either produce without routing with only production orders, or produce with routing - By default, there is an order in the work orders (serially), but you can override it to be able to work in parallel - Time clocking on work orders and block time on work centers with reporting on OEE, performance, losses, ... - Real-time adaptation of timings on operations - Lots/serial numbers can be inputted like in the pickings on manufacturing orders. It is also possible to input them in the work orders. - Material availability independent of production order state (possibility to start production when only part of it is there) - Work sheets on work orders - Put messages on work orders to make your workers pay attention to something - Full traceability link to see for each produced piece of stock, the consumed pieces, ... - Separate scrap object (a scrap is not done based on an original move anymore) - Separate unbuild system (if you want to unbuild into its original components) Thanks to all people that helped during this development, notably but not limited to Chirag A Dodiya (cod@odoo.com), Gaurav Panchal (gan@odoo.com), Jignesh Rathod (jir@odoo.com), Mansi Trivedi (mtr@odoo.com), Pariket Trivedi (ptr@odoo.com).