diff options
| author | Adrien Widart <awt@odoo.com> | 2021-05-17 08:20:45 +0000 |
|---|---|---|
| committer | Adrien Widart <awt@odoo.com> | 2021-05-26 11:24:49 +0000 |
| commit | 012de9c86fbd1b85d180e279740d5053b9ba4b0f (patch) | |
| tree | 2fa2eed61fd52ba52b2cf4c0d0f9652ecd62f457 /odoo/cli/deploy.py | |
| parent | e18e256137e4593aee0cb6f1d0fcc4168dff79c1 (diff) | |
[FIX] mrp: use work center's TZ to plan operations
When planning a Manufacturing Order, if an operation takes place in work
center with a different time zone, the computed date may be incorrect
(the start date may be outside the working hours)
To reproduce the error:
(Use demo data. Current timezone: Europe/Brussels)
1. In Settings, enable "Work Orders"
2. Open an existing Work Center
3. Click on "Standard 40 hours/week"
4. Set Timezone to "Asia/Bangkok"
- Note that all slots are between 8:00-12:00 and 13:00-17:00
5. Create two storable products P_compo and P_finished
6. Create a Bill of Materials BM:
- Product: P_finished
- BoM Type: Manufacture this product
- Components: 1 x P_compo
- Operations: 3 x Operation with existing work centers
7. Create a Manufacturing Order:
- Bill of Material: BM
- Quantity: 100
8. Save, Confirm, Plan
Error: (it depends on the time the test is done) The 'Scheduled Start
Date' of the second operation is incorrect. Adding the time zone
difference gives a time that is outside the work center's timetable
(i.e., outside 8:00-12:00 and 13:00-17:00).
The computations do not consider the time zone of the work center.
OPW-2393330
closes odoo/odoo#70841
Related: odoo/enterprise#18524
Signed-off-by: William Henrotin <Whenrow@users.noreply.github.com>
Diffstat (limited to 'odoo/cli/deploy.py')
0 files changed, 0 insertions, 0 deletions