summaryrefslogtreecommitdiff
path: root/addons/web_editor/static/src/xml/editor.xml
diff options
context:
space:
mode:
authorjem-odoo <jem@openerp.com>2018-08-13 15:21:57 +0200
committerjem-odoo <jem@openerp.com>2018-08-13 17:32:22 +0200
commitb4af54f9c23b65abe50dde3dfb397510ec2fcee4 (patch)
treefcb6605a64fdaf2e14af45c4ac3646e0d9816eca /addons/web_editor/static/src/xml/editor.xml
parent3e1207c4ac3967c66d62cbe1f67fb6826e462f92 (diff)
[IMP] sale_timesheet: billing time at employee rate
When a project become billable, the employee can now timesheet on a same task, at different rate. The project should be linked to a SO, and the mapping between the employee and the SO line will be done using 2 mecanisms: 1/ task rate: the SO line set on the task is chosen for any employee timesheeting on the task. 2/ employee rate: a map exists on the project, matching employee with an SO line from the SO of the project. If the employee is not in the map, the fallback will be the SO from the task, or the one from the project. This makes the SO line on the task always visible. The billable type of a project depends on if the map is filled or not. There is 2 ways of making a project billable: - project is created from SO confirmation (depending of product configuration) - through the wizard "Create Sales Order": a SO will be created and the project will be associated to it. The subtask should follow the configuration of its parent project (and not parent task). Task #34703 Closes #26111
Diffstat (limited to 'addons/web_editor/static/src/xml/editor.xml')
0 files changed, 0 insertions, 0 deletions