diff options
| author | Josse Colpaert <jco@odoo.com> | 2019-02-01 17:33:50 +0000 |
|---|---|---|
| committer | Nicolas Martinelli <nim@odoo.com> | 2019-02-06 08:55:56 +0000 |
| commit | 845a6a9e08293a955127ec587397bbf7bec27116 (patch) | |
| tree | d45d63a9024fdd03b932fafd8ebbae9e47dcab1c /addons/web_editor/static/lib/summernote/src/js/EventHandler.js | |
| parent | c7c938996f783cbb187697b9f36c8359b2c4733f (diff) | |
[FIX] stock: lot in multiple locations
- Activate:
'Track lots or serial numbers'
'Manage several Warehouses, each one composed by several stock locations'
'Advanced routing of products using rules'
- In the main warehouse, activate Pick + Ship
- In Stock Locations, create 'WH/Stock/Shelf 3' and 'WH/Stock/Shelf 4'
(1 and 2 already exist, use the same config)
- Create a new product 'Foo', activate Tracking By Lots
- On Foo, use 4 times the "Update Qty on Hand" (order is important):
Add 1 on Shelf 2, create a lot
Add 1 on Shelf 1, use the same lot
Add 3 on Shelf 4, use the same lot
Add 1 on Shelf 3, use the same lot
- Create a SO, set a partner
- Ensure that YourCompany is used as warehouse
- Add several SO lines (order is important)
a line with 1 product Foo
a second line with 1 product Foo
a third line with 4 products Foo
- Confirm the SO, you now have 2 deliveries, 1 Pick, 1 Out
- Open the Pick, all moves should be available, you should have:
4 operations:
Shelf 2, quantity 1
Shelf 4, quantity 3
Shelf 1, quantity 1
Shelf 3, quantity 1
3 moves:
A, quantity 1
B, quantity 1
C, quantity 4
- On each operation, select the lot created before and set the quantity
to be fully done
- Validate the Pick
The moves end up like this:
- Move A with qty 1: is done and linked with a quant of 1
- Move B with qty 1: is done and linked with no quant
- Move C with qty 4: is done and linked with a quant of 1, a quant of 3,
a quant of 1 (sum is 5)
In the Out picking, the move linked with the source move (B) with no
quant stays in "Waiting another move" even if the source move is done.
This outgoing move will never be available.
In the method `recompute_remaining_qty`, we loop on operations, and
match them wih the moves. However, the operation with the largest
quantity (Shelf 4, quantity 3) is processed before the move with the
highest quantity (C, quantity 4). Therefore, when we later loop on move
C, `qty_assign_cmp` is larger than zero, which sets `need_rereserve` and
ultimately triggers `rereserve_quants` in `do_transfer`.
A first part of the fix is to check for the location of the quants when
matching moves and operations. This fixes the original issue, but
inconsistencies can still arise since a quant which is taken partially.
therefore, we make sure to never take more than the quantity on the
link.
opw-1932624
closes odoo/odoo#30857
Diffstat (limited to 'addons/web_editor/static/lib/summernote/src/js/EventHandler.js')
0 files changed, 0 insertions, 0 deletions
