diff options
| author | Aaron Bohy <aab@odoo.com> | 2018-01-18 16:57:57 +0100 |
|---|---|---|
| committer | Aaron Bohy <aab@odoo.com> | 2018-01-19 14:31:05 +0100 |
| commit | 4399bb555585fc983d6143e1daf313edd0d9a253 (patch) | |
| tree | ba6acc4d3b882e8dc6ff7f6e5c767780d8337db9 /addons/web/static/src/js/views/basic/basic_renderer.js | |
| parent | 7faecb6fe43d5fc42e43aa7080952c186dcf3804 (diff) | |
[FIX] web: Calendar: traceback when creating first event
The Calendar controller made the assumption that the Dialog widget
opens synchronously, which isn't the case (for the first instance
actually), as it has to load its xml template. So it crashed as
the controller tried to focus the input inside the dialog, before
it was actually rendered.
Diffstat (limited to 'addons/web/static/src/js/views/basic/basic_renderer.js')
0 files changed, 0 insertions, 0 deletions
