diff options
| author | Yannick Tivisse <yti@odoo.com> | 2017-06-07 14:44:47 +0200 |
|---|---|---|
| committer | Yannick Tivisse <yti@odoo.com> | 2017-08-07 12:19:31 +0200 |
| commit | c3e9a088107f5b03314c8229c8c9ff74721fd77c (patch) | |
| tree | 55893704c8724af485bbf9882daab061b4b2c5a9 /addons/web/static/src/js/views/basic/basic_controller.js | |
| parent | a9268af14052f1c98058de763d417e5569fa433f (diff) | |
[IMP] project: Remove contraint between start and end dates
It doesn't make sense.
- The end date is set on a task when it's moved into a folded stage.
- The start date is the last date on which the task as been assigned to a user.
It's possible that an unassigned task is moved into a folded stage, and it shouldn't raise a ValidationError
Diffstat (limited to 'addons/web/static/src/js/views/basic/basic_controller.js')
0 files changed, 0 insertions, 0 deletions
