summaryrefslogtreecommitdiff
path: root/addons/mail/static/src/xml/thread.xml
diff options
context:
space:
mode:
authorArnold Moyaux <arm@odoo.com>2017-11-29 10:23:57 +0100
committerArnold Moyaux <arm@odoo.com>2017-12-04 13:38:22 +0100
commit2afedc99a6d758b66b6c0194202564aeb731c64c (patch)
treea20de794ca31e6bc12edd153f1f5def1a2c30ef2 /addons/mail/static/src/xml/thread.xml
parent3a1c56f885902fa1d6b47e5bde49628cde62c152 (diff)
[FIX] mrp: workorder SN required only when moves are consumed
When the user do a work order with a final product tracked by lot or serial number. A serial number is asked at the end of the first workorder. The purpose is to link consumed products with the SN/lot produced. However it could happens that no component are consumed during the first and following work order. This commit allows to by pass the lot/SN registration if nothing is consumed.
Diffstat (limited to 'addons/mail/static/src/xml/thread.xml')
0 files changed, 0 insertions, 0 deletions