diff options
| author | jem-odoo <jem@openerp.com> | 2018-01-09 09:47:32 +0100 |
|---|---|---|
| committer | jem-odoo <jem@openerp.com> | 2018-01-15 15:15:45 +0100 |
| commit | aa8a39fc4f2dab278a0cf42a58656527ce1efe19 (patch) | |
| tree | 408b4e98d6b2a3949534d1f1923ab8720c49a797 /addons/google_drive/static | |
| parent | 628cddca24ca9d6576092ed8d98d12d39dc88e97 (diff) | |
[FIX] hr_timesheet: change project of timesheet when changing task
When we change the project of a task, we want the
related timesheets to be linked to the new project.
However, since a timesheet is an analytic line with
a project, a task with timesheet can not be without
project. In that case, an error is raise to prevent
this case.
opw-803811
Diffstat (limited to 'addons/google_drive/static')
0 files changed, 0 insertions, 0 deletions
