diff options
| author | Arnold Moyaux <arm@odoo.com> | 2019-04-10 15:02:27 +0000 |
|---|---|---|
| committer | Arnold Moyaux <arm@odoo.com> | 2019-04-11 07:24:49 +0000 |
| commit | 027ff77a9e113bc0aa097b3ee1f7a75fccd570c3 (patch) | |
| tree | 098a8d95b1712059da437bd78f9c15ea6b1d2caa /addons/calendar/data/mail_data.xml | |
| parent | d5d93474de7f7f9b0875b533772d3a64047124cb (diff) | |
[FIX] stock, mrp: scheduler assign finished move
Usecase to reproduce
- Create a BoM with finished product A and Comp C
- Create a RR on product A with min qty 10
- Product A is tracked by serial number and have route manufacture
- Run the scheduler twice.
The finished tabs in the manufacturing order created from the order
point contains 10 move lines with 1 qty reserved and 0 quantity done.
The first run created the MO. The second run, assign the finished moves
and thus created the move lines for finished product A.
However those move line are not used by mrp because the workorder and
the produce wizard will only create new lines instead of using existing
lines with reservation. Also action_assign on MO only trigger
_action_assign on raw moves.
This commit add a hook on scheduler in order to modify the domain that
will be used in order to search moves to assign. Use the hook in order
to avoid move with the production_id many2one set.
closes odoo/odoo#32597
Signed-off-by: Arnold Moyaux <amoyaux@users.noreply.github.com>
Diffstat (limited to 'addons/calendar/data/mail_data.xml')
0 files changed, 0 insertions, 0 deletions
